Allow the engine to run for 2–3 minutes before plugging in equipment.
Once the engine is running smoothly, gradually move the choke lever to the "OPEN" position. 3. Connecting Devices
Change engine oil and inspect the spark plug (gap should be 0.7–0.8mm).
Allow the engine to run for 2–3 minutes before plugging in equipment.
Once the engine is running smoothly, gradually move the choke lever to the "OPEN" position. 3. Connecting Devices beg 5000a 2 kalibr instruktsiia
Change engine oil and inspect the spark plug (gap should be 0.7–0.8mm). Allow the engine to run for 2–3 minutes